  • Construction Date

    Duration: 14 Days

  • Category

    Grinding and Preparation

Stand Alone Office Building

Burbank-CA

Project from EvoCon Construction Inc. IT’S SO CLEAN to Grind, Prepare and Semi-Polishing the concrete floor of an Office Building in Burbank-CA.


Job Performed in 14 Days

This stand-alone office building located in Burbank, CA was a kind of challenge due to serious concrete floor imperfections and heavy mastic glue left on the surface. We decided to operate this job using the Terrco grinder machine (2 units) to Grind and Prepare the 5.500 square feet area. The customer requested a Semi-Polishing finish, which was achieved with a 400 grit resin pad process.

This job took 14 days to be finished due to a very extensive flooring preparation including patching holes, cracks, and divots, overlay installation, bolts removals, etc.,