EvoCon – WSS Shoes

Project Info

  • Construction Date

    Duration: 4 Days

  • Category

    Grinding and Preparation

WSS Shoes

Los Angeles-CA

Another project from EvoCon Construction Inc. IT’S SO CLEAN to Grinding and Prepare the concrete floor of WSS Shoes in Los Angeles.


Job Performed in 4 Days

The 22.000 square feet open frame and under construction job site had its concrete floor just poured and we had the task to flatter down the entire floor because the bad concrete installation. The Grinding work was done using a top of line Terrco and Scanmaskin grinders machines and was crucial to achieving the best result, lowering down all the bumps and straightening up the imperfections from the original floor installation. The job was running during day and night to be accomplished on time without interfering with the construction schedule. The job was successfully done within 4 days of its commencement.