JMF DEV – Office Suites

Project Info

  • Construction Date

    Duration: 4 Days

  • Category

    Epoxy Coating, Grinding and Preparation, Self-leveling Overlayment

Pershing Square Building 11th Floor

Downtown – Los Angeles-CA

Another project from JMF DEVELOPMENT LLC. IT’S SO CLEAN to Grind, Prepare and apply an Epoxy Coating on the flooring of the office suites on the 11th floor of the building.


Job Performed in 4 Days

 

A time sensitive schedule allowing us to work only during the night time and to deliver the job in 4 days. With the right tools, expertise, and skills this job was perfectly done on time.

The big challenge on this 3.000 square feet job was to search and patch all the structural cracks that could lead the Epoxy thru the floor below. After all the major cracks and holes been patched the Grinding process was done and the Epoxy Coating was applied on the floor.